Again, we are announcing our next MSMA Workshop as follows:
Workshop No. 1- Introductory Concepts, Design Criteria and Procedures in MSMAM
Workshop No. 3- How to Design Detention/Sediment Basins and Culverts
Workshop No. 2- How To Design Drainage System Using Free Software
Workshop No. 4- On-Site Detention (OSD) and Erosion & Sediment Control Plan (ESCP).
I am pleased to announce the 8th Workshop will be held in June, 2009 in KL. Details as follows:
Workshop No. 1- Introductory Concepts, Design Criteria and Procedures in MSMAM
Workshop No. 3- How to Design Detention/Sediment Basins and Culverts
Workshop No. 2- How To Design Drainage System Using Free Software
Workshop No. 4- On-Site Detention (OSD) and Erosion & Sediment Control Plan (ESCP).
The 7th MSMAM Workshop was successfully completed last week at UTM, KL.
We have a total of 60 participants for the three workshops which was held over 6 days.
Due to popular requests from participants of our workshop, we are launching our new Workshop No. 4 on OSD (On-Site Detention) and ESCP (Erosion and Sediment Control Plan) in our 8th MSMAM Workshop. The content of the workshop is on the brochure which you can download below.
The next MSMAM workshop will be held in November/December 2008 as follows:
Workshop No. 1- Introductory Concepts, Design Criteria and Procedures in MSMAM
Workshop No. 3- How to Design Detention/Sediment Basins and Culverts
Workshop No. 2- How To Design Drainage System Using Free Software
Workshop No. 4- On-Site Detention (OSD) and Erosion & Sediment Control Plan (ESCP).