Among the given Q values, the culverts are flooded above 88 m3/s
GROUP 2
Answer:The culvert (JTR and 800m culvert downstream) flooded at Q=66cu.m/s
The answer is Q = 66 m3/s
Q=66 m3/s start flooded.